3d动漫精品无码专区_黄色的黄色片黄色影院_欧美高清在线一区_亚洲三级日韩无码中文字幕

PRODUCT LIST

Contacts:Manager Wang
Tel:0515-80616558
Fax:0515-80616658
After-sale service:0515-86358288
E-mail:jsyfhb@163.com

Your current position: home page >

  • How does the United Company continue to establish a social grinding station?
  • At present, more and more cement joint companies have been set up in China, and the joint companies are formed jointly by large local groups. Although there are clouds in the industry, it is beneficial to the production capacity of cement in the region, the transformation and upgrading of the industry, and the role of regional price preservation, but it is also full of "joint lifting of prices" from the beginning. Criticisms.
    Since then, the "tacit understanding" between large conglomerates is more complete. This is also a greater worry for the social grinding station.
    Grinding station is a necessary part of grinding clinker into the final product cement. In general, it has many advantages, such as near the market, convenient traffic, flexible body volume and so on. The number of cement grinding stations accounted for 63.8% of the total number of cement enterprises, and the proportion of grinding stations owned by ten enterprises before the clinker production accounted for only 12.22% of the number of national grinding stations, that is, the mass of the social grinding station.
    The external sales volume of large cement group generally only accounts for 5%~30% of its output, and the proportion is not high. At the beginning of last year, domestic clinker, especially the region along the river, began to enter the time of control sale, while foreign clinker entered the river market in our country, but it was hit by price, and the confidence of the market was difficult to pick up.
    At present, the impact of clinker impact at home and abroad is not very big. At present, the clinker in our country is about 400-410 yuan / ton, but the price of Vietnamese clinker boat is 360-370 yuan per ton after the Vietnam clinker. In particular, the joint venture established by regional big enterprises will make the clinker control sale more obvious. It is not surprising that clinker is the forerunner of cement price and price upside down.
    At the same time, most social grinding stations are faced with many problems, such as serious clinker control, strict environmental inspection, high cost of production, and even some of the reasons that are in the stage of stopping production because of environmental protection and no clinker. In the situation of the structural reform of the supply side and the entry into the deepwater area, partial grinding is made. The future of the station will be faced with transformation and upgrading, industrial chain extension or directly withdrawing from the market.
    If there is a definite loss, then a loss reduction is earned. That is to say, finding a way out as early as possible is bright. So it is very appropriate to describe the current situation of the grinding station.
    Since 13th Five-Year, large-scale infrastructure construction has led to a huge demand for cement. Because of flexible investment in grinding stations and no need for capacity replacement, a new production line can be built, so the quantity has sprung up like bamboo shoots after the rain. In the period of no peak production limit, the grinding station still has a certain profit space. With the time of peak production and the further expansion of space in recent years, the market supply is tense, the large enterprise groups reduce the clinker export, and the difficulty of the grinding station becomes more difficult.
    On the one hand, the state unify the 32.5R strength grade of the composite Portland cement (PC32.5R), the production cost of the grinding station is increased; on the other hand, if there are excessive standards in the production process, the environmental protection exceeding the standard penalty, the energy consumption exceeding the standard, and the implementation of the step electricity price measures are further added to the production pressure of the enterprise.
    The national development and Reform Commission issued the guidance list of industrial restructuring (2011 Edition), which clearly stated that the cement grinding station under 600 thousand tons / year is a restricted category. According to many research and suggestions from the relevant industry, enterprises should make serious decisions and think. At present, the 600 thousand tons / years of grinding stations, such as 300 thousand tons / year, should withdraw from the market as soon as possible, and the enterprises in the limits or above can withdraw from the market or carry on the transformation in combination with their own circumstances.
    Turning to the localities, some local governments will be more strict with environmental protection supervision, and only a few places need to fulfill their duty to pay taxes. For grinding station, it is essential to make a scientific judgement for the future of the enterprise ahead of time.
    Objectively speaking, grinding station has its advantages and necessity. If the enterprises continue to produce, they need to meet the standards of environmental protection and energy consumption, and the enterprises can control themselves according to the environmental impact assessment book. However, enterprises that fail to meet the standards are facing the dilemma of shutting down.
    If we continue to produce, on the one hand, we need to work on the supply of raw materials, through the establishment of cooperative relations with large enterprise groups, clinker enterprises, and third party e-commerce platforms (such as equity cooperation, capital cooperation, direct business cooperation, etc.), and the developed areas can also strengthen the purchase of imported clinker; the other is the other party. It needs further transformation and upgrading or industrial chain extension to reduce production costs and enhance profit margins. Under the circumstances of environmental protection and energy consumption reaching the standard, technical transformation and energy saving transformation should be carried out to reduce costs. It may also be transformed into concrete services to make dry mixed mortar and concrete admixture to provide premixed materials for concrete prefabricated parts and functional cement components.
    For those enterprises that do not carry out production after comprehensive consideration, they should plan ahead, seek reorganization or conduct cross industry transformation in the direction of industrial tourism and hotels.
    Return to the cement industry, not only the grinding station, all energy cement enterprises in environmental protection, energy consumption standards will be more stringent, when the future cement demand is not in the high platform period, some backward production capacity and no core competitiveness, will enter the social grinding station similar embarrassment.
HOME      PRODUCT     CASE       NEWS     TECHNICAL     ABOUT     CONTACT